Projects

Completed Projects

A. (End of Warranty Inspection) in wind sector

Hawa Power Energy

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Drone
  • Gen-Shaft Alignment
  • Vibration analyses
  • Oil/Grease analyses

Plant Description

Plant Capacity: 49.375
Model: GW 1.715
No of WTG: 29
Note: Sub-Con of Tuv

Jhimpir power Limited (JPL)

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Drone
  • Vibration analyses and Rotor balancing
  • Oil/Grease analyses

Plant Description

Plant Capacity: 49.375
Model: GW 1.715
No of WTG: 29
Note: Sub-Con of Tuv

Master Wind energy Limited

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Drone
  • Vibration analyses
  • Oil/Grease analyses

Electrical Balance of Plant (EBOP)

Plant Description

Plant Capacity: 52.8 MW
Model: GE 80-1.6 MW
No of WTG: 33
Note: Sub-Con of Tuv

Act Wind

Scope

WTG-Scope

  • Internal tower inspection
  • Blade inspection via Drone
  • Vibration analyses and Rotor balancing
  • Gen-Shaft Alignment
  • Oil/Grease analyses

Plant Description

Plant Capacity 30 MW
Model: GW 82/15000
No of WTG: 20
Note: Sub-Con of Tuv

Zephyr Power limited

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Drone
  • Vibration analyses
  • Gen-Shaft Alignment
  • Oil/Grease analyses

Electrical Balance of Plant (EBOP)

Plant Description

Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTG: 25

Lucky Renewable Energy limited

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Rope Access
  • Vibration analyses
  • Gen-Shaft Alignment
  • Oil/Grease analyses

Electrical Balance of Plant (EBOP)

Plant Description

Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25

R

Lake Side Energy limited

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Rope Access
  • Vibration analyses and Rotor balancing
  • Oil/Grease analyses

Electrical Balance of Plant (EBOP)

Plant Description

Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25

R

Liberty Wind Power-1 & 2

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Drone
  • Vibration analyses
  • Gen-Shaft Alignment
  • Oil/Grease analyses
  • HSE, Civil

Electrical Balance of Plant (EBOP)

Plant Description

Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 31

R

NAZDA Green Energy Limited

Scope

WTG-Scope

  • Internal tower inspection
  • Main bearing & Gearbox Endoscopy
  • Blade inspection via Drone
  • Vibration analyses and Rotor balancing
  • Oil/Grease analyses
  • HSE, Civil

Electrical Balance of Plant (EBOP)

Plant Description

Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25

B. Completed Miscellaneous projects in wind sector

Foundation wind Energy Limited

Scope

  • WTG-Scope (internal Tower inspection)

Plant Description

Plant capacity: 50 MW
Model: N100/2500
No of WTG: 20

Yunus Energy Limited (YEL)

Scope

  • Blade inspection via rope access
  • External Tower painting & repair

Plant Description

Plant capacity: 50 MW
Model: N100/2500
No of WTG: 20

Metro wind farm Jhimpir-1 & 2

Scope

  • Blade inspection via rope access
  • Blade inspection (01 SG WTG)

Plant Description

Plant capacity: 50 MW
Model: N100/2500
No of WTG: 20

China three gorgeous (First/Second)

Scope

  • Blade Repair work
  • Electric Chain hoist inspection (Service lift)
  • Blade inspection via Drone
  • Electric chain hoist load test and inspection
  • External Tower paint repair work
  • Elevator inspection and rectification

Plant Description

Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25

Indus Energy Power Limited

Scope

  • Elevator inspection and testing

Plant Description

GE 2 MW

Tenaga Power plant

Scope

  • Blade inspection via Rope access

Plant Description

GE 2 MW (02 WTG)

Master Green Energy

Scope

  • Replacement of Pitch cylinder

Plant Description

SG 114 2 MW (01 WTG)

Enjaz Power (Keniya)

Scope

  • Technical inspection and consultation

Plant Description

Vestas 1.8 MW (WTG:30)

Master Green

Scope

  • 36 Maintenance schedule activities

Plant Description

Plant Capacity: 50 MW

Wind Limited

Scope

  • Refilling and repair the WTG accumulators

Plant Description

Model: SG 114-2.0 MW
No of WTGs: 25

Master Green Energy

Scope

  • Replacement of Pitch cylinder

Plant Description

SG 114 2 MW (01 WTG)

Enjaz Power (Keniya)

Scope

  • Technical inspection and consultation

Plant Description

Vestas 1.8 MW (WTG:30)

C. Solar projects

Gibbs Paint

Capacity

  • 350kw

Plant Description

  • Longi 550W P-type,
  • Huawei Inverters, 100KW each
  • GI L2 with Ballast

KBK Enterprises (FSD)

Capacity

  • 250kw

Plant Description

  • Longi 550W
  • Huawei Inverters 150K each
  • GI L2, Civil blocks

NLC Wahgah border

Capacity

  • 102kw

Plant Description

  • Canadian 535W
  • Zonergy Inverters, 50K each
  • Al P1 with Ballast

Millennium cables (Saggiyan pul)

Capacity

  • 180kw

Plant Description

  • Longi 545W
  • Huawei Inverters of 100 and 60K
  • GI L2 with customized Ballast of 2ft

Jilani Plastic Factory

Capacity

  • 828KW

Plant Description

  • Longi 575W
  • Huawei Inverters of 115K and 1 Huawei Inverter of 50K
  • GI L2 with customized Ballast foundations

100+ Residential Solar projects

Capacity

  • 500kw

Plant Description

  • Different PV Modules as per demand
  • Different Inverters as per demand
  • Miscellaneous

D. In hand and
other projects

Yunus Energy limited

Scope

  • 828KWMain bearing borescope

Plant Description/Status

Model: N100/2500
No of WTG: 20
In biding process

Artistic milliners

Scope

  • Vibration and noise monitoring

Plant Description/Status

Textile industry
Approved

Sachal wind farm

Scope

  • Blade repair

Plant Description/Status

Gold wind turbine Jhimpir site

Denizli Wind Power Plan

Scope

  • Pitch cylinders replacement & repair.

Plant Description/Status

Turkey: G 114 2 MW 08
Completion process

Gold wind (UAE)

Scope

  • Maintenance and inspection

Plant Description/Status

GW 2 MW 05 Turbines

Zephyr power Limited (ZPL)

Scope

  • 80KW

Plant Description/Status

Installation stage

Hyundai Nishat Motors

Scope

  • 1MW

Plant Description/Status

Commissioning stage

Projects Diesel Genset Power Plants

English Biscuit

Plant Capacity

  • 1 Mwe

No. of Engines

1 x Cat Diesel

Project

Power Plant

Ghani Spinning, Nooriabad

Plant Capacity

  • 2 MW

No. of Engines

2 x Cat G3516

Project

Power Plant

Artistic Milliners Unit#3

Plant Capacity

  • 1 Mwe

No. of Engines

1 x Cat 3516

Project

Power Plant

Falcon Cement MMPL

Plant Capacity

  • 1 Mwe

No. of Engines

1 x Cat Diesel

Project

Power Plant

Ms. Liberty Energy Site Karachi

Plant Capacity

  • 4 Mwe

No. of Engines

1 x Cat 3516

Project

Co-Generation

Barrett Hodgson, Site Karachi

Plant Capacity

  • 1 Mwe

No. of Engines

1 x Cat Diesel

Project

Power Plant

Younus Textile Mills Karachi

Plant Capacity

  • 4 MW

No. of Engines

4 x Cat G3516

Project

Co-Generation

Al Habib Textile Mills

Plant Capacity

  • 2.2 Mwe

No. of Engines

2 x Cat G 3516 B

Project

Project Completed

Darul Salam Lahore

Plant Capacity

  • 3 Mwe/li>

No. of Engines

3 x JGS 320

Project

Project Completed

Lahore Textile Mills

Plant Capacity

  • 6 Mwe

No. of Engines

3 x G-3520 C

Project

Project Completed

Classic Denim Site Karachi

Plant Capacity

  • 2 Mwe

No. of Engines

G Cat 3520 C

Project

Project Completed

Artistic Milliners Unit#2

Plant Capacity

  • 2 Mwe

No. of Engines

2 x JGS 320

Project

Project Completed

Soorty Denim NAT Highway

Plant Capacity

  • 3 Mwe

No. of Engines

3 x JGS 320

Project

Project Completed

Fuji Cement

Plant Capacity

  • 1.4 Mwe

No. of Engines

3 x 3516 C

Project

Project Completed

Zara Textile Nooriabad

Plant Capacity

  • 4 Mwe

No. of Engines

4 x JGS 320

Project

Project Completed

ECO Textile Nooriabad

Plant Capacity

  • 3 Mwe

No. of Engines

3 x JGS 320

Project

Project Completed

Premium Textile Mills

Plant Capacity

  • 1.4 Mwe

No. of Engines

1 x 3516 C

Project

Project Completed

A.G.I Korangi Industrial Area

Plant Capacity

  • 1.6 Mwe

No. of Engines

1 x CAT 3516 B

Project

Project Completed

Karachi Sheraton Hotle

Plant Capacity

No. of Engines

500 RT

Project

Chiller