Projects
Completed Projects
A. (End of Warranty Inspection) in wind sector

Hawa Power Energy
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Drone
- Gen-Shaft Alignment
- Vibration analyses
- Oil/Grease analyses
Plant Description
Plant Capacity: 49.375
Model: GW 1.715
No of WTG: 29
Note: Sub-Con of Tuv

Jhimpir power Limited (JPL)
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Drone
- Vibration analyses and Rotor balancing
- Oil/Grease analyses
Plant Description
Plant Capacity: 49.375
Model: GW 1.715
No of WTG: 29
Note: Sub-Con of Tuv

Master Wind energy Limited
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Drone
- Vibration analyses
- Oil/Grease analyses
Electrical Balance of Plant (EBOP)
Plant Description
Plant Capacity: 52.8 MW
Model: GE 80-1.6 MW
No of WTG: 33
Note: Sub-Con of Tuv

Act Wind
Scope
WTG-Scope
- Internal tower inspection
- Blade inspection via Drone
- Vibration analyses and Rotor balancing
- Gen-Shaft Alignment
- Oil/Grease analyses
Plant Description
Plant Capacity 30 MW
Model: GW 82/15000
No of WTG: 20
Note: Sub-Con of Tuv

Zephyr Power limited
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Drone
- Vibration analyses
- Gen-Shaft Alignment
- Oil/Grease analyses
Electrical Balance of Plant (EBOP)
Plant Description
Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTG: 25

Lucky Renewable Energy limited
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Rope Access
- Vibration analyses
- Gen-Shaft Alignment
- Oil/Grease analyses
Electrical Balance of Plant (EBOP)
Plant Description
Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25
Lake Side Energy limited
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Rope Access
- Vibration analyses and Rotor balancing
- Oil/Grease analyses
Electrical Balance of Plant (EBOP)
Plant Description
Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25
Liberty Wind Power-1 & 2
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Drone
- Vibration analyses
- Gen-Shaft Alignment
- Oil/Grease analyses
- HSE, Civil
Electrical Balance of Plant (EBOP)
Plant Description
Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 31
NAZDA Green Energy Limited
Scope
WTG-Scope
- Internal tower inspection
- Main bearing & Gearbox Endoscopy
- Blade inspection via Drone
- Vibration analyses and Rotor balancing
- Oil/Grease analyses
- HSE, Civil
Electrical Balance of Plant (EBOP)
Plant Description
Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25
B. Completed Miscellaneous projects in wind sector
Foundation wind Energy Limited
Scope
- WTG-Scope (internal Tower inspection)
Plant Description
Plant capacity: 50 MW
Model: N100/2500
No of WTG: 20
Yunus Energy Limited (YEL)
Scope
- Blade inspection via rope access
- External Tower painting & repair
Plant Description
Plant capacity: 50 MW
Model: N100/2500
No of WTG: 20
Metro wind farm Jhimpir-1 & 2
Scope
- Blade inspection via rope access
- Blade inspection (01 SG WTG)
Plant Description
Plant capacity: 50 MW
Model: N100/2500
No of WTG: 20
China three gorgeous (First/Second)
Scope
- Blade Repair work
- Electric Chain hoist inspection (Service lift)
- Blade inspection via Drone
- Electric chain hoist load test and inspection
- External Tower paint repair work
- Elevator inspection and rectification
Plant Description
Plant Capacity: 50 MW
Model: SG 114-2.0 MW
No of WTGs: 25
Indus Energy Power Limited
Scope
- Elevator inspection and testing
Plant Description
GE 2 MW
Tenaga Power plant
Scope
- Blade inspection via Rope access
Plant Description
GE 2 MW (02 WTG)
Master Green Energy
Scope
- Replacement of Pitch cylinder
Plant Description
SG 114 2 MW (01 WTG)
Enjaz Power (Keniya)
Scope
- Technical inspection and consultation
Plant Description
Vestas 1.8 MW (WTG:30)
Master Green
Scope
- 36 Maintenance schedule activities
Plant Description
Plant Capacity: 50 MW
Wind Limited
Scope
- Refilling and repair the WTG accumulators
Plant Description
Model: SG 114-2.0 MW
No of WTGs: 25
Master Green Energy
Scope
- Replacement of Pitch cylinder
Plant Description
SG 114 2 MW (01 WTG)
Enjaz Power (Keniya)
Scope
- Technical inspection and consultation
Plant Description
Vestas 1.8 MW (WTG:30)
C. Solar projects
Gibbs Paint
Capacity
- 350kw
Plant Description
- Longi 550W P-type,
- Huawei Inverters, 100KW each
- GI L2 with Ballast
KBK Enterprises (FSD)
Capacity
- 250kw
Plant Description
- Longi 550W
- Huawei Inverters 150K each
- GI L2, Civil blocks
NLC Wahgah border
Capacity
- 102kw
Plant Description
- Canadian 535W
- Zonergy Inverters, 50K each
- Al P1 with Ballast
Millennium cables (Saggiyan pul)
Capacity
- 180kw
Plant Description
- Longi 545W
- Huawei Inverters of 100 and 60K
- GI L2 with customized Ballast of 2ft
Jilani Plastic Factory
Capacity
- 828KW
Plant Description
- Longi 575W
- Huawei Inverters of 115K and 1 Huawei Inverter of 50K
- GI L2 with customized Ballast foundations
100+ Residential Solar projects
Capacity
- 500kw
Plant Description
- Different PV Modules as per demand
- Different Inverters as per demand
- Miscellaneous
D. In hand and
other projects
Yunus Energy limited
Scope
- 828KWMain bearing borescope
Plant Description/Status
Model: N100/2500
No of WTG: 20
In biding process
Artistic milliners
Scope
- Vibration and noise monitoring
Plant Description/Status
Textile industry
Approved
Sachal wind farm
Scope
- Blade repair
Plant Description/Status
Gold wind turbine Jhimpir site
Denizli Wind Power Plan
Scope
- Pitch cylinders replacement & repair.
Plant Description/Status
Turkey: G 114 2 MW 08
Completion process
Gold wind (UAE)
Scope
- Maintenance and inspection
Plant Description/Status
GW 2 MW 05 Turbines
Zephyr power Limited (ZPL)
Scope
- 80KW
Plant Description/Status
Installation stage
Hyundai Nishat Motors
Scope
- 1MW
Plant Description/Status
Commissioning stage
Projects Diesel Genset Power Plants
English Biscuit
Plant Capacity
- 1 Mwe
No. of Engines
1 x Cat Diesel
Project
Power Plant
Ghani Spinning, Nooriabad
Plant Capacity
- 2 MW
No. of Engines
2 x Cat G3516
Project
Power Plant
Artistic Milliners Unit#3
Plant Capacity
- 1 Mwe
No. of Engines
1 x Cat 3516
Project
Power Plant
Falcon Cement MMPL
Plant Capacity
- 1 Mwe
No. of Engines
1 x Cat Diesel
Project
Power Plant
Ms. Liberty Energy Site Karachi
Plant Capacity
- 4 Mwe
No. of Engines
1 x Cat 3516
Project
Co-Generation
Barrett Hodgson, Site Karachi
Plant Capacity
- 1 Mwe
No. of Engines
1 x Cat Diesel
Project
Power Plant
Younus Textile Mills Karachi
Plant Capacity
- 4 MW
No. of Engines
4 x Cat G3516
Project
Co-Generation
Al Habib Textile Mills
Plant Capacity
- 2.2 Mwe
No. of Engines
2 x Cat G 3516 B
Project
Project Completed
Darul Salam Lahore
Plant Capacity
- 3 Mwe/li>
No. of Engines
3 x JGS 320
Project
Project Completed
Lahore Textile Mills
Plant Capacity
- 6 Mwe
No. of Engines
3 x G-3520 C
Project
Project Completed
Classic Denim Site Karachi
Plant Capacity
- 2 Mwe
No. of Engines
G Cat 3520 C
Project
Project Completed
Artistic Milliners Unit#2
Plant Capacity
- 2 Mwe
No. of Engines
2 x JGS 320
Project
Project Completed
Soorty Denim NAT Highway
Plant Capacity
- 3 Mwe
No. of Engines
3 x JGS 320
Project
Project Completed
Fuji Cement
Plant Capacity
- 1.4 Mwe
No. of Engines
3 x 3516 C
Project
Project Completed
Zara Textile Nooriabad
Plant Capacity
- 4 Mwe
No. of Engines
4 x JGS 320
Project
Project Completed
ECO Textile Nooriabad
Plant Capacity
- 3 Mwe
No. of Engines
3 x JGS 320
Project
Project Completed
Premium Textile Mills
Plant Capacity
- 1.4 Mwe
No. of Engines
1 x 3516 C
Project
Project Completed
A.G.I Korangi Industrial Area
Plant Capacity
- 1.6 Mwe
No. of Engines
1 x CAT 3516 B
Project
Project Completed
Karachi Sheraton Hotle
Plant Capacity
No. of Engines
500 RT
Project
Chiller